Trail | Length | Season | Permitted Activities (Legend) | Status |
---|---|---|---|---|
1982 Canadian Mount Everest Expedition Interpretive | 2.1 km | Summer Only |
![]() |
Open |
Bill Benson
Limited access due to William Watson Closure |
0.7 km one-way | Summer Only |
![]() ![]() |
Warning |
Black Prince Cirque Interpretive
May 27th: A few snow and ice patches. Note: The Blackshale Creek Suspension Bridge is NOT accessed from this trail. |
4.2 km | Summer Only |
![]() |
Open |
![]() |
2.2 km one-way | Winter Only |
![]() ![]() |
Open |
Braille | 2.2 km | Winter Only |
![]() |
Open |
Burstall Pass
June 5th: The lower portion of trail is snow free with snow patches becoming progressively deeper with elevation, with the some completely snow bound sections near border. Note: Bikes permitted on first 2.9 km of trail ONLY. |
7.4 km one-way | Summer Only |
![]() ![]() |
Open |
Burstall Pass (Backcountry) | km | Winter Only |
![]() |
Open |
Chester Lake
June 5th: Snow free. Downed trees removed. Chester Lake: Annual closure in place for Chester Lake until Jun 29 to allow area to dry and prevent damage to trail. |
4.6 km one-way | Summer Only |
![]() ![]() ![]() |
Closed |
Elbow Lake
June 11th: Trail is snow free. Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
1.4 km one-way | Summer Only |
![]() ![]() ![]() |
Warning |
Elk Pass
June 2nd: Mostly bare ground with muddy/snowy sections. Sign changeover complete. |
5.6 km | Summer Only |
![]() ![]() |
Open |
Highwood Meadows
June 11th: Trail is snow free. Closed for construction Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.6 km one-way | Summer Only |
![]() ![]() |
Closed |
Kananaskis Canyon Interpretive
Closed: Stream crossings washed away by penstock/dam construction. Trail is impassable and is closed indefinitely. |
0.8 km | Summer Only |
![]() |
Closed |
Lookout
May 29th: Mix of bare and snow covered. |
1.7 km | Summer Only |
![]() ![]() |
Open |
Lower Lake Interpretive
Limited access due to William Watson Closure |
0.5 km one-way | Summer Only |
![]() |
Warning |
Maude-Lawson
June 2nd: Partially snow covered. Note: This trail has been redirected just west of Forks for access to Turbine Canyon. |
7.5 km | Summer Only |
![]() |
Open |
![]() Trackset from Elkwood to the Visitor Centre on April 9th. The remainder was trackset on April 2nd. |
4.0 km | Winter Only |
![]() |
Open |
Peter Lougheed Paved
Bear Closure: Portion of trail between Lower Lakes to Sarrail campgrounds. |
12.1 km one-way | Summer Only |
![]() ![]() |
Partially Closed |
Pocaterra
Note: This is not the undesignated Pocaterra Ridge or Cirque route. |
9.9 km one-way | Summer Only |
![]() ![]() |
Open |
Ptarmigan Cirque Interpretive
June 11th: Trail is mostly snow free with a few small patches of snow in shaded areas. Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
4.5 km | Summer Only |
![]() |
Warning |
Rawson Lake
June 2nd: Trail is snow free with muddy sections. |
3.9 km one-way | Summer Only |
![]() |
Open |
Rock Glacier Interpretive
June 11th: Snow free Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.15 km one-way | Summer Only |
![]() |
Warning |
Rockwall
Closed for bear activity. |
0.5 km | Summer Only |
![]() ![]() |
Closed |
Rolly Road Training Grid
Six sets of tracks set.
|
km | Winter Only |
![]() |
Open |
![]() Limited access due to William Watson Closure |
0.8 km | Year-Round |
![]() ![]() ![]() |
Warning |
![]() June 2nd: Snow free between Interlakes and Point campground junction. Trail not observed beyond Point junction. Snow free between North Interlakes and Forks Campground. Patches of snow observed on upper headwall. Note: Bikes only permitted to Invincible Creek, 3.8 km from trailhead |
10.2 km | Summer Only |
![]() ![]() |
Open |
Upper Lake
May 30th: Snow free between Interlakes and Point campground junction and from North Interlakes to Upper Lake. The rest of the trail has not been observed this year. One small patch of snow remains on the Northwest shore of Upper Lake Trail, downed trees have been removed. |
15.7 km | Summer Only |
![]() ![]() |
Open |
Whiskey Jack
May 29th: A mix of bare and some snow patches with muddy sections. |
3.9 km one-way | Summer Only |
![]() ![]() |
Open |
William Watson Lodge Access
Due to William Watson Closure |
0.6 km one-way | Year-Round |
![]() ![]() ![]() ![]() |
Closed |
Peninsula | 0.4 km | Summer Only |
![]() |
Open |
Tailwater Snowshoe | 1.9 km | Winter Only |
![]() ![]() ![]() |
Open |
Frozen Toad Loop Snowshoe | 8.1 km | Winter Only |
![]() ![]() ![]() |
Open |
Torpor Loop | 6.1 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
South Sawmill Loop | 2.8 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
William Watson Lodge Connector
May 6th: Mainly snow covered. Sign changeover complete. |
0.7 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
Boulton Creek Interpretive | 4.9 km | Summer Only |
![]() |
Open |
Marl Lake Interpretive | 1.5 km for loop | Summer Only |
![]() ![]() |
Open |
Lower Lake | 3.5 km one-way | Summer Only |
![]() |
Open |
High Rockies (Winter)
Note: Between Nov. 1 and May 1 the trail is closed through the Buller Slide Path due to Highway Avalanche Control. |
63.0 km Goat Creek to Peninsula Day Use | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
High Rockies (Summer)
June 9th: Snow free with some muddy sections. Downed trees removed. Partial closure due to activities associated with G7 Note: Hiker-cyclist camping allowed at select day use areas only from Jun 1 - Sep 20. See details.
|
63.0 km Goat Creek to Peninsula Day Use; 80.0 km Goat Creek to Elk Pass | Summer Only |
![]() ![]() ![]() |
Partially Closed |